Patons Lane Resource Recovery Centre
is an asset wholly owned by the
Bingo Industries Limited Group

Dewatering project

  • Dewatering is required to remove excess storm water (rainfall runoff) which has accumulated primarily in the old quarry pit void and smaller sediment dams on the site over the last several years. Extensive studies have been completed by various experts over the last two years in consultation with the NSW Environmental Protection Authority (EPA) to develop an appropriate dewatering program. The pattern of water release will not be continuous and seeks to mimic the naturally intermittent flows of Blaxland Creek and its wet and dry spells in order to protect stream integrity and ecology.

© Patons Lane RRC 2018